Vent: the demo Hypertherm at the Lincoln trade show had a 12 foot lead and no slack loop, watch that
It was zip tied tight along the boom and every time the gantry moved it yanked the torch connector, watched a guy burn through 3 consumables in under 10 minutes. If your shop does that to save a buck on cable, is it even worth the downtime?