Old timer told me to always double check my submittals before ordering.
I had a guy named Jerry, been drywalling since the 70s, tell me to always double check my submittal specs before I place a material order. I was doing a basement finish in Boulder last month and I skimmed the submittal for the acoustic panels. It said 2 foot by 4 foot but the drawing had notes about a staggered grid. I ignored it and ordered all the standard tiles. When they showed up, the grid was 22 and a half inches wide on one side, not 24. I had to eat $180 in restocking fees and wait three extra days. Jerry was right and I still owe him a beer for not listening sooner. Has anyone else had a supplier slip a weird spec into a submittal that you almost missed?