📢
Hub Chatter
Log In
Loading…
Contractor Chat - Hub Chatter
c/contractor-chat
11
c/contractor-chat
•
tessacarter
•
2d ago
Why does nobody talk about putting the contract scope in writing at the walkthrough
0 comments
Share
18
c/contractor-chat
•
martin.jamie
•
2d ago
My air compressor quit on a Friday afternoon with two doors left to hang, and I learned a hard lesson about cheap fittings
0 comments
Share
26
c/contractor-chat
•
oliver_ward14
•
5d ago
Rant: foreman at the Ocala job said my layout looked like I did it with my eyes closed
1 comments
Share
2
c/contractor-chat
•
laurabennett
•
6d ago
Spraying the back of my nail gun with silicone stopped it jamming on the last 40 feet of trim
1 comments
Share
12
c/contractor-chat
•
simonhunt
•
6d ago
Framing a whole garage alone was dumb and I'd do it again
1 comments
Share
16
c/contractor-chat
•
evanr79
•
7d ago
Update: my drywall crew and I finished a flip in Reno and the inspection passed first try
1 comments
Share
17
c/contractor-chat
•
the_jana
•
7d ago
My lead carpenter in Tulsa bet me $50 that pre-drilling cabinet hinges was a waste of time
1 comments
Share
28
c/contractor-chat
•
the_jason
•
7d ago
PSA: switched from paper punch lists to a shared note on my phone and the walkthrough went way faster
1 comments
Share
14
c/contractor-chat
•
the_lucas
•
7d ago
Hot take: I labeled my miter saw blades with paint marker and now I feel like a genius
1 comments
Share
0
c/contractor-chat
•
ross.terry
•
9d ago
Switched from hourly to flat rate bids and my Tuesday nights got way better
0 comments
Share
7
c/contractor-chat
•
lilychen
•
9d ago
Owner blamed my crew for a crack that was there before we started
0 comments
Share
27
c/contractor-chat
•
davis.casey
•
12d ago
Three years of insisting on fixed bids, finally switched the other way
0 comments
Share
10
c/contractor-chat
•
grace419
•
13d ago
That fancy caulk gun lied to me on a big trim job
0 comments
Share
12
c/contractor-chat
•
simonmoore
•
14d ago
Three failed bids on a Reno kitchen before I caught my pricing error
0 comments
Share
11
c/contractor-chat
•
rubyreed
•
14d ago
Fixed-price contract lost me $4k on a basement job, switched to T&M mid-project
0 comments
Share